Te asesoramos, Escríbenos
» Interconnection Studies

BLOG


Interconnection Studies

We prepare the Electrical Studies requested by the Network Operators, Transmission Companies and the UPME to interconnect a new project to the national grid. The project can be the interconnection of a generator, a new load, a new line, etc. We prepare the simplified interconnection studies requested by CREG in its CREG Resolution 030 of 2018, to allow the interconnection of small-scale self-generation and distributed generation projects. To perform the interconnection studies we use the DIgSILENT PowerFactory software.